Surface preparations prior to painting included stain block spot primer coats, crack repairs, removal of disused wall bolts, grinding, sanding and cleaning of the existing black metal access stairwell.
A low sheen top coat was applied to the concrete ceiling, concrete walls and associated pipes/conduit with a semi-gloss paint applied to the plant room access doors & frames. The rooftop plant room concrete floors was covered with a fine non-slip aggregate.
In addition to the painting we supplied and installed a new metal cover plate to seal existing vertical cable guard, new concrete bunded walls to the tape area in “U-Shape” format and new Galvanised metal surround to the wall mounted air-ventilation grill.
Craftwork Project Management has successfully completed numerous internal, external and specialised painting projects for Buildcorp Asset Solutions. During the last 4 years, the team has completed all works undertaken in accordance with written specifications, occupational health & safety guidelines and allocated time periods set.